Project office

The Project office is a unit of the Engineering Sector specializing in the preparation of technical documentation for various types of projects in the area of power systems. It also offers consulting and expert supervision of services and operations on site.
Our team of young experts has participated in the preparation of a number of diverse projects in the area of power systems, such as:
- substations and electric power distribution facilities (up to 400 kV) (technical documentation for installation, rehabilitation, modernisation, etc.),
- transmission lines (up to 400 kV) (technical documentation for installation, rehabilitation, relocation, OPGW installation, etc.),
- medium and low voltage grids,
- electric power distribution substations,
- lighting (tunnels, bridges, downtown neighbourhoods and suburbs, etc.),
- residential and office buildings,
- industrial sheds,
- shopping centers, etc.
We are proud to say that our continuous advancement and growth and the high quality of services we offer are a result of our accumulated expertise, experience and permanent training, which allows us to keep up with the latest developments and trends in the area of power systems.
- distributivnih trafostanica,
- rasvete (tunela, mostova, gradskih i prigradskih naselja, itd.),
- stambeno-poslovnih objekata, industrijskih hala, tržnih centara itd.
Do sada stečena znanja, iskustva i kadrovski potencijal, te stalna usavršavanja, koja nam omogućavaju praćenje svetskih trendova iz oblasti elektroenergetike, su osnovni razlog neprekidnog razvoja i unapređenja, te izrazito visokog kvaliteta ponuđenih usluga.
Reference List: Project office
Investor | Year | Project name | Project type |
| PD ELEKTROSRBIJA Elektrodistribucija ŠABAC | 2010 | Reconstruction of SS 110/20/35 kV Vladimirci | Main project |
| US STEEL SRBIJA | 2009 | Reconstruction of SS 110/6,3 kV | Project of executed object |
| PD DRINSKO-LIMSKE HIDROELEKTRANE | 2009 | Replacement of LV equipment in 110 kV generator field and TL field HPP Zvornik | Project of investment maintenance |
| ZP HIDROELEKTRANE NA TREBIŠNJICI AD | 2009 | Project of replacement TL distance protection 220 kV in HPP Trebinje | Project of investment maintenance |
| AD PRENOS PODGORICA | 2009 | Extention of SS 110/35 kV Tivat for TL feld and measuring field 110 kV | Main project |
| ELEKTROPRIVREDA CRNE GORE | 2008/09 | SS 110/35 kV Virpazar | Main project, Performer project, Project of executed object |
| ELEKTROPRENOS BIH | 2008 | SS 110/x kV Janja | Project for performance, Project of executed state |
| ELEKTROPRENOS BIH | 2007 | Switching facility 400/220/110/x kV Trebinje | Project for performance, Project of executed state |
| ELEKTROPRENOS BIH | 2005 | SS 400/110 kV Ugljevik | Project for performance,Project of executed state |
| ELEKTROPRENOS BIH | 2004 | SS 400/220/110 kV Višegrad | Project for performance,Project of executed state |
| ELEKTROPRENOS BIH | 2004 | SS 400/220/110 kV Sarajevo 20 | Project for performance,Project of executed state |
| ELEKTROPRENOS BIH | 2004 | SS 220/110/x kV Prijedor 2 | Project for performance,Project of executed state |
| ELEKTROPRENOS BIH | 2004 | SS 400/110 kV Banja Luka 6 | Project for performance,Project of executed state |
FACILITIES 35 KV AND LOVER VOLTAGE LEVEL
Investor | Year | Project name | Project type |
| ELEKTROSRBIJA KRALJEVO | 2010 | Switching facility 35 kV Loznica 1 – Šepački put | Main project |
| ZP HIDROELEKTRANE NA TREBIŠNJICI AD | 2009 | Project replacement of own consumpiton transformer protection and 35 kV TL | Project of investment maintenance |
| ELEKTROPRIVREDA CRNE GORE | 2009 | SS 35/10 kV Bistrica | Project of executed state |
| PD CENTAR KRAGUJEVAC | 2009 | SS 35/10 kV Smederevska Palanka 1 | Project of investment maintenance |
| ELEKTROSRBIJA – KRALJEVO | 2009 | SS 35/10 kV Ćuprija 2 | Project of investment maintenance |
| PD CENTAR KRAGUJEVAC ENERGETIKA | 2009 | TEC-Reconstruction of facility 6,3 kV own consumption | Project of executed object |
| ELEKTRODISTRI-BUCIJA HERCEG NOVI | 2008 | SS 35/10 kV Savina | Project of executed state |
| PAM ALATNICA | 2008 | Pole SS 20/0,4 kV Pam Alatnica | Conceptual solution |
| ELEKTRODISTRI-BUCIJA LESKOVAC | 2008 | SS 35/10 kV Ždeglovo | Performer project |
| ELEKTRODISTRI-BUCIJA LESKOVAC | 2008 | SS 35/10 kV Nevit | Performer project |
| UN BIH (ED BIJELJINA) | 2003 | SS 35/10 kV Srebrenica | Project for performance, Project of executed state |
Investor | Year | Project name | Project type |
| ELNOS BL, Banja Luka | 2009 | Project of mobile distributive transformer station MDTS 10(20)/0,4 kV, 1x630 kVA | Main project |
| A.D. RAFINERIJA NAFTE BROD | 2009 | Power supply of compressor | Project of investment maintenance |
| A.D. RAFINERIJA NAFTE BROD | 2009 | Power supply of reservoir S3 – S4 | Project of investment maintenance |
| A.D. RAFINERIJA NAFTE BROD | 2009 | Power supply of reservoir S – 67 | Project of investment maintenance |
| A.D. RAFINERIJA NAFTE BROD | 2009 | Ground and power supply of mixer reservoir S – 68 motor | Project of reconstruction |
| A.D. RAFINERIJA NAFTE BROD | 2009 | Power supply cabinets for the automatic measurement of liquid levels in reservoirs | Project of investment maintenance |
| TELEKOMUNIKACIJE REPUBLIKE SRPSKE | 2009 | TKC Park Mladen Stojanović | Report of diesel-electric generators installation |
| A.D. RAFINERIJA NAFTE BROD | 2009 | Compensation of reactive energy Rafnerije nafte | Conceptual solution |
| AD RADIJATOR | 2008 | EUROIMPIANTE – 47/06 Radijator AD | Conceptual solution |
Investor | Year | Project name | Project type |
| AD PRENOS PODGORICA | 2010 | Fiber cable connection on TL 110 kV SS podgorica 2 – SS Virpazar | Project of executed state |
| AD PRENOS PODGORICA | 2009 | Electrical insatallation works on TL 110 kV Budva – Tivat | Project of executed state |
| AD PRENOS PODGORICA | 2009 | Electrical insatallation works on TL 110 kV Tivat – Herceg Novi | Project of executed state |
| AD PRENOS PODGORICA | 2009 | Electrical insatallation works on TL 110 kV Budva – Cetinje | Project of executed state |
| AD PRENOS PODGORICA | 2009 | Electrical insatallation works on TL 110 kV Podgorica 2 – Cetinje | Project of executed state |
| AD PRENOS PODGORICA | 2009 | Electrical insatallation works on TL 220 kV Podgorica 1 – Perućica | Project of executed state |
| AD PRENOS PODGORICA | 2009 | Fiber cable connection on TL 110 kV SS Tivat – SS Herceg Novi | Project of executed state |
| AD PRENOS PODGORICA | 2009 | Fiber cable connection on TL 110 kV SS Budva – SS Tivat | Project of executed state |
| AD PRENOS PODGORICA | 2009 | Fiber cable connection on TL 220 kV HPP Piva – SS Pljevlja 2 | Project of executed state |
| AD PRENOS PODGORICA | 2009 | Fiber cable connection on TL 110 kV SS Perućica – SS Nikšić | Project of executed state |
| ELEKTROPRIVREDA CRNE GORE | 2009 | TL 2x110 kV Perućica – Nikšić | Main project of electrical installation works and fber cable connection |
| ELEKTROPRIVREDA CRNE GORE | 2009 | Fiber cable connection on TL 110 kV Budva – Cetinje | Project of executed state |
| ELEKTROPRIVREDA CRNE GORE | 2009 | Fiber cable connection on TL 110 kV Podgorica 1 – Perućica | Project of executed state |
| ELEKTROPRIVREDA CRNE GORE | 2009 | Fiber cable connection on TL 110 kV SS Perućica – SS Nikšić | Project of executed state |
| ELEKTROPRIVREDA CRNE GORE | 2009 | Fiber cable connection on TL 110 kV Podgorica 2 – Cetinje | Project of executed state |
| ELEKTROPRIVREDA CRNE GORE | 2008 | Fiber cable connection on TL 400 kV Pljevlja 2 – Ribarevine | Project of executed state |
| ELEKTROPRIVREDA CRNE GORE | 2008 | Fiber cable connection on TL 400 kV SS Podgorica 2 – Ribarevine | Project of executed state |
| ELEKTROPRIVREDA CRNE GORE | 2008 | Fiber cable connection on TL 400 kV Podgorica 2 – Trebinje | Project of executed state |
| ELEKTROPRIVREDA CRNE GORE | 2008 | TL 110 kV Podgorica 2 – Bar entry – exit for SS 110/35 kV Virpazar | Main project |