Transmission Lines Unit

Tim za dalekovode 

One of the most complex type of operations performed by the Engineering Sector of ELNOS BL is building transmission lines. A successful completion of these projects requires higly-qualified and skilled staff, state-of-the-art equipment and machinery as well as the ensurance of standard worker safety measures.

 

For its operations of cable routing and installation, the Transmission Lines Team uses the latest generation of instruments and machines that secure a strict control of tensile strain, which, along with standard wire installation, allows the fitting of optical wire.

 

Currently, Bosnia and Herzegovina is implementing the project of rehabilitation and upgrade of high and medium voltage grids (projects Power III and IV) in four stages:

 

- Rehabilitation and assembly of high and medium voltage transmission lines;

- Rehabilitation and modernisation of high and medium voltage electric power transformer stations;

- Building the system of power system management and relevant telecommunications through implementation of SCADA/EMS and Telecommunications subprojects;

- Rehabilitation and building of power distribution grids.

 The company ELNOS BL has an important role in the implementation of these projects.

 

 

Reference List: Transmission Lines Unit

Investor

YearLocationActivities
ŽELJEZNICE RS, Doboj2010Doboj Fixing of failure and repairing of damage on TL 110 kV SS D01-EVP Doboj
AD PRENOS PODGORICA2010PodgoricaInstallation of OPGW cable with associated equipment on TL 110 kV Podgorica 2 – Virpazar
ELEKTRO-HERCEGOVINA2009TrebinjeExecution of works on optical network ZP Elektro-Hercegovina Trebinje
RiTE UGLJEVIK2009UgljevikRelocation of pole positions 6 and 7 on 35 kV TL
A.D. MEPSO, Skoplje2009Bitolj -SkopljeReplacement of existing rope by OPGW on TL 400 kV SS Bitola 2 – SS Skoplje 4
A.D. MEPSO, Skoplje2009HPP Vrutok - SkopljeReplacement of existing rope by OPGW on TL 220 kV HPP Vrutok – SS Skoplje 1
A.D. MEPSO, Skoplje2009HPP Vrutok – HPP ŠpiljeReplacement of existing rope by OPGW on TL 110 kV HPP Vrutok – HPP Špilje
A.D. MEPSO, Skoplje2009HPP Kozjak – HPP MatkaReplacement of existing rope by OPGW on TL 110 kV HPP Kozjak – HPP Matka 1
A.D. MEPSO, Skoplje2009Štip - KočaniReplacement of existing rope by OPGW on TL 110 kV SS Štip – SS Kočani
A.D. MEPSO, Skoplje2009NegotinoReplacement of existing rope by OPGW on TL 110 kV SS Dubravo – SS Negotino
A.D. MEPSO, Skoplje2009Gostivar - OslomejReplacement of existing rope by OPGW on TL 110 kV SS Gostivar – SS Oslomej
A.D. MEPSO, Skoplje2009Veles - KavadarciReplacement of existing rope by OPGW on TL 110 kV SS Veles 2 – SS Kavadarci
A.D. MEPSO, Skoplje2009Radovište - StrumicaReplacement of existing rope by OPGW on TL 110 kV SS Radoviš - SS Strumica
A.D. MEPSO, Skoplje2009RadovišteReplacement of existing rope by OPGW on TL 110 kV SS Bučim – SS Radoviš
A.D. MEPSO, Skoplje2009Štip Replacement of existing rope by OPGW on TL 110 kV SS Štip – SS Bučim
A.D. MEPSO, Skoplje2009Kumanovo - ProbištipReplacement of existing rope by OPGW on TL 110 kV SS Kumanovo – SS Probištip
A.D. MEPSO, Skoplje2009Skoplje - KumanovoReplacement of existing rope by OPGW on TL 110 kV SS Skoplje – SS Kumanovo
ELEKTROPRENOS BiH, Banja Luka2008Banja LukaSupply of material and equipment for construction works on building of TL 2x110 kV Banja Luka 7 (entry – exit)
PEVEC D.O.O., Banja Luka2008Banja LukaSupply, mounting, execution, inspection and putting cable ducts into operation
ELEKTRO DOBOJ2008DobojSupply of material and installation of OPGW rope on 35 kV TL Doboj 1 – Sočkovac
Elektroprivreda Crne Gore FC Prenos2008Podgorica-TrebinjeInstallation of OPGW on TL 400 kV Podgorica 2 - Trebinje
Elektroprivreda Crne Gore FC Prenos2008Podgorica-RibarevineInstallation of OPGW on TL 400 kV Podgorica 2 - Ribarevine
Elektroprivreda Crne Gore FC Prenos2008Pljevlja-RibarevineInstallation of OPGW on TL 400 kV Pljevlja - Ribarevine
Elektroprivreda Crne Gore FC Prenos2008Podgorica-PerućicaInstallation of OPGW on TL 220 kV Podgorica 1 - Perućica
Elektroprivreda Crne Gore FC Prenos2008HPP Piva- PljevljaInstallation of OPGW on TL 220 kV HPP Piva - Pljevlja
Elektroprivreda Crne Gore FC Prenos2008Podgorica - CetinjeInstallation of OPGW on TL 110 kV Podgorica - Cetinje
Elektroprivreda Crne Gore FC Prenos2008Cetinje- BudvaInstallation of OPGW on TL 110 kV Cetinje - Budva
Elektroprivreda Crne Gore FC Prenos2008Budva-TivatInstallation of OPGW on TL 110 kV Budva - Tivat
Elektroprivreda Crne Gore FC Prenos2008Tivat-Herceg NoviInstallation of OPGW on TL 110 kV Tivat – Herceg Novi
Elektroprivreda Crne Gore FC Prenos2008Perućica - NikšićInstallation of OPGW on TL 110 kV Perućica - Nikšić
ELEKTRO DOBOJ2008DobojRepair of steel-lattice poles for laying of OPGW ropes
ELEKTROHERCEGOVINA, Trebinje2008GackoInstallation of OPGW ropes on 35 kV TL TPP Gacko-SS Gacko and HPP Trebinje 1 -SS Grančarevo
ELEKTRO DOBOJ2008DobojBuilding of TL 35 kV Usora – Ševarlije
ELEKTRO DOBOJ2007DobojReconstruction of TL 35 kV Usora – Jelah
STEEL MEHANIKA, Derventa2006DerventaRelocation of TL 110 kV Gradačac – Derventa
STEEL MEHANIKA, Derventa2006DerventaPreparation of technical documentation for relocation of  TL 110 kV Gradačac – Derventa
ELEKTROPRENOS BIH, Banja Luka2006DobojElectrical ftting works on TL 110 kV Doboj 1 – Doboj 2
ELEKTROPRENOS BIH, Banja Luka2006DobojElectrical ftting works on TL 110 kV Doboj 2 – Doboj 3
BRČKO DISTRIKT BIH, Brčko2005BrčkoDisassembly of safety rope and installation of OPGW on  TL 35 kV Brčko – Brezovo polje
SIEMENS, Beč2005RS/BiHPreparation of technical documentation for installation of OPGW on TL 110, 220 and 400 kV
DALEKOVOD, Zagreb2004Jajce-PrijedorRepair, reconstruction, disassembly of safety rope and installation of OPGW on TL 220 kV Jajce – Prijedor – Mraclin
DALEKOVOD, Zagreb2004Jajce-PrijedorRepair, reconstruction, disassembly of safety rope and installation of OPGW on TL 220 kV Prijedor – Međurić – Sisak
DALEKOVOD, Zagreb2004PrijedorConstruction of TL 2x220 kV entry/exit points at SS Prijedor 2
DALEKOVOD, Zagreb2004Mostar-GackoRepair, reconstruction, disassembly of safety rope and installation of OPGW on TL 400 kV Mostar 4 – Gacko
DALEKOVOD, Zagreb2004Ugljevik-BrčkoRepair, reconstruction, disassembly of safety rope and installation of OPGW on TL 400 kV Ugljevik – Brčko
SIEMENS, Beč2004Tuzla-Banja LukaDisassembly of safety rope & installation of OPGW on TL 400 kV Tuzla - Banja Luka
SIEMENS, Beč2004TrebinjeDisassembly of safety rope & installation of OPGW on TL 110 kV Trebinje 1 – Trebinje
SIEMENS, Beč2004Bileća-TrebinjeDisassembly of safety rope & installation of OPGW on TL 110 kV Bileća – Trebinje 1
SIEMENS, Beč2004N.Topola- SrbacDisassembly of safety rope & installation of OPGW on TL 110 kV Nova Topola – Srbac
SIEMENS, Beč2004Srbac-DerventaDisassembly of safety rope & installation of OPGW on TL 110 kV Srbac – Derventa
SIEMENS, Beč2004PrijedorDisassembly of safety rope & installation of OPGW on TL 110 kV Prijedor 2 – Sanski Most
SIEMENS, Beč2004Ugljevik-ZvornikDisassembly of safety rope & installation of OPGW on TL 110 kV Ugljevik – Zvornik
SIEMENS, Beč2004Banja Luka-LaktašiDisassembly of safety rope & installation of OPGW on TL 110 kV Banja Luka 1 – Laktaši
SIEMENS, Beč2004BijeljinaDisassembly of safety rope & installation of OPGW on TL 110 kV Bijeljina 1 – Bijeljina 2
SIEMENS, Beč2004Gacko-BilećaDisassembly of safety rope & installation of OPGW on TL 110 kV Gacko – Bileća
SIEMENS, Beč2004NevesinjeDisassembly of safety rope & installation of OPGW on TL 110 kV Nevesinje – KT Nevesinje
SIEMENS, Beč2004Bijeljina-BrčkoDisassembly of safety rope & installation of OPGW on TL 110 kV Brčko 2 – Bijeljina 1
SIEMENS, Beč2004Bijeljina-BrčkoDisassembly of safety rope & installation of OPGW on TL 110 kV Višegrad – Goražde 2
SIEMENS, Beč2004Prnjavor-UkrinaDisassembly of safety rope & installation of OPGW on TL 110 kV Prnjavor – Ukrina
SIEMENS, Beč2004Stanari-UkrinaDisassembly of safety rope & installation of OPGW on TL 110 kV Stanari – Ukrina
SIEMENS, Beč2004Stanari-TeslićDisassembly of safety rope & installation of OPGW on TL 110 kV Stanari – Teslić
SIEMENS, Beč2004Doboj-TeslićDisassembly of safety rope & installation of OPGW on TL 110 kV Doboj 1 – Teslić
SIEMENS, Beč2004Brčko-ModričaDisassembly of safety rope & installation of OPGW on TL 110 kV Brčko 2 – Modriča
SIEMENS, Beč2004DobojDisassembly of safety rope & installation of OPGW on TL 110 kV Doboj 1 – Doboj 2
SIEMENS, Beč2004Doboj-DerventaDisassembly of safety rope & installation of OPGW on TL 110 kV Doboj 2 – Derventa
ELEKTRO DOBOJ2003DobojDisassembly of safety rope & installation of OPGW on TL 110 kV Rudanka – Usora
ELEKTROPRENOS, Banja Luka2003Banja LukaDisassembly of safety rope & installation of OPGW on TL 110 kV Prijedor 2 – Prijedor 5
ELEKTROPRENOS, Banja Luka2002Banja Luka - Mrkonjić GradDisassembly of safety rope & installation of OPGW on TL 110 kV Banja Luka – Mrkonjić Grad
ELEKTROPRENOS, Banja Luka2002Banja Luka-GradiškaDisassembly of safety rope & installation of OPGW on TL 110 kV Banja Luka – Gradiška – Topola
ELEKTROPRENOS, Banja Luka2002VlasenicaDisassembly of safety rope & installation of OPGW on TL 110 kV Srebrenica – Konjević Polje – Vlasenica