Reference List: Transmission Lines Unit

Investor

YearLocationActivities
ŽELJEZNICE RS, Doboj2010Doboj Fixing of failure and repairing of damage on TL 110 kV SS D01-EVP Doboj
AD PRENOS PODGORICA2010PodgoricaInstallation of OPGW cable with associated equipment on TL 110 kV Podgorica 2 – Virpazar
ELEKTRO-HERCEGOVINA2009TrebinjeExecution of works on optical network ZP Elektro-Hercegovina Trebinje
RiTE UGLJEVIK2009UgljevikRelocation of pole positions 6 and 7 on 35 kV TL
A.D. MEPSO, Skoplje2009Bitolj -SkopljeReplacement of existing rope by OPGW on TL 400 kV SS Bitola 2 – SS Skoplje 4
A.D. MEPSO, Skoplje2009HPP Vrutok - SkopljeReplacement of existing rope by OPGW on TL 220 kV HPP Vrutok – SS Skoplje 1
A.D. MEPSO, Skoplje2009HPP Vrutok – HPP ŠpiljeReplacement of existing rope by OPGW on TL 110 kV HPP Vrutok – HPP Špilje
A.D. MEPSO, Skoplje2009HPP Kozjak – HPP MatkaReplacement of existing rope by OPGW on TL 110 kV HPP Kozjak – HPP Matka 1
A.D. MEPSO, Skoplje2009Štip - KočaniReplacement of existing rope by OPGW on TL 110 kV SS Štip – SS Kočani
A.D. MEPSO, Skoplje2009NegotinoReplacement of existing rope by OPGW on TL 110 kV SS Dubravo – SS Negotino
A.D. MEPSO, Skoplje2009Gostivar - OslomejReplacement of existing rope by OPGW on TL 110 kV SS Gostivar – SS Oslomej
A.D. MEPSO, Skoplje2009Veles - KavadarciReplacement of existing rope by OPGW on TL 110 kV SS Veles 2 – SS Kavadarci
A.D. MEPSO, Skoplje2009Radovište - StrumicaReplacement of existing rope by OPGW on TL 110 kV SS Radoviš - SS Strumica
A.D. MEPSO, Skoplje2009RadovišteReplacement of existing rope by OPGW on TL 110 kV SS Bučim – SS Radoviš
A.D. MEPSO, Skoplje2009Štip Replacement of existing rope by OPGW on TL 110 kV SS Štip – SS Bučim
A.D. MEPSO, Skoplje2009Kumanovo - ProbištipReplacement of existing rope by OPGW on TL 110 kV SS Kumanovo – SS Probištip
A.D. MEPSO, Skoplje2009Skoplje - KumanovoReplacement of existing rope by OPGW on TL 110 kV SS Skoplje – SS Kumanovo
ELEKTROPRENOS BiH, Banja Luka2008Banja LukaSupply of material and equipment for construction works on building of TL 2x110 kV Banja Luka 7 (entry – exit)
PEVEC D.O.O., Banja Luka2008Banja LukaSupply, mounting, execution, inspection and putting cable ducts into operation
ELEKTRO DOBOJ2008DobojSupply of material and installation of OPGW rope on 35 kV TL Doboj 1 – Sočkovac
Elektroprivreda Crne Gore FC Prenos2008Podgorica-TrebinjeInstallation of OPGW on TL 400 kV Podgorica 2 - Trebinje
Elektroprivreda Crne Gore FC Prenos2008Podgorica-RibarevineInstallation of OPGW on TL 400 kV Podgorica 2 - Ribarevine
Elektroprivreda Crne Gore FC Prenos2008Pljevlja-RibarevineInstallation of OPGW on TL 400 kV Pljevlja - Ribarevine
Elektroprivreda Crne Gore FC Prenos2008Podgorica-PerućicaInstallation of OPGW on TL 220 kV Podgorica 1 - Perućica
Elektroprivreda Crne Gore FC Prenos2008HPP Piva- PljevljaInstallation of OPGW on TL 220 kV HPP Piva - Pljevlja
Elektroprivreda Crne Gore FC Prenos2008Podgorica - CetinjeInstallation of OPGW on TL 110 kV Podgorica - Cetinje
Elektroprivreda Crne Gore FC Prenos2008Cetinje- BudvaInstallation of OPGW on TL 110 kV Cetinje - Budva
Elektroprivreda Crne Gore FC Prenos2008Budva-TivatInstallation of OPGW on TL 110 kV Budva - Tivat
Elektroprivreda Crne Gore FC Prenos2008Tivat-Herceg NoviInstallation of OPGW on TL 110 kV Tivat – Herceg Novi
Elektroprivreda Crne Gore FC Prenos2008Perućica - NikšićInstallation of OPGW on TL 110 kV Perućica - Nikšić
ELEKTRO DOBOJ2008DobojRepair of steel-lattice poles for laying of OPGW ropes
ELEKTROHERCEGOVINA, Trebinje2008GackoInstallation of OPGW ropes on 35 kV TL TPP Gacko-SS Gacko and HPP Trebinje 1 -SS Grančarevo
ELEKTRO DOBOJ2008DobojBuilding of TL 35 kV Usora – Ševarlije
ELEKTRO DOBOJ2007DobojReconstruction of TL 35 kV Usora – Jelah
STEEL MEHANIKA, Derventa2006DerventaRelocation of TL 110 kV Gradačac – Derventa
STEEL MEHANIKA, Derventa2006DerventaPreparation of technical documentation for relocation of  TL 110 kV Gradačac – Derventa
ELEKTROPRENOS BIH, Banja Luka2006DobojElectrical ftting works on TL 110 kV Doboj 1 – Doboj 2
ELEKTROPRENOS BIH, Banja Luka2006DobojElectrical ftting works on TL 110 kV Doboj 2 – Doboj 3
BRČKO DISTRIKT BIH, Brčko2005BrčkoDisassembly of safety rope and installation of OPGW on  TL 35 kV Brčko – Brezovo polje
SIEMENS, Beč2005RS/BiHPreparation of technical documentation for installation of OPGW on TL 110, 220 and 400 kV
DALEKOVOD, Zagreb2004Jajce-PrijedorRepair, reconstruction, disassembly of safety rope and installation of OPGW on TL 220 kV Jajce – Prijedor – Mraclin
DALEKOVOD, Zagreb2004Jajce-PrijedorRepair, reconstruction, disassembly of safety rope and installation of OPGW on TL 220 kV Prijedor – Međurić – Sisak
DALEKOVOD, Zagreb2004PrijedorConstruction of TL 2x220 kV entry/exit points at SS Prijedor 2
DALEKOVOD, Zagreb2004Mostar-GackoRepair, reconstruction, disassembly of safety rope and installation of OPGW on TL 400 kV Mostar 4 – Gacko
DALEKOVOD, Zagreb2004Ugljevik-BrčkoRepair, reconstruction, disassembly of safety rope and installation of OPGW on TL 400 kV Ugljevik – Brčko
SIEMENS, Beč2004Tuzla-Banja LukaDisassembly of safety rope & installation of OPGW on TL 400 kV Tuzla - Banja Luka
SIEMENS, Beč2004TrebinjeDisassembly of safety rope & installation of OPGW on TL 110 kV Trebinje 1 – Trebinje
SIEMENS, Beč2004Bileća-TrebinjeDisassembly of safety rope & installation of OPGW on TL 110 kV Bileća – Trebinje 1
SIEMENS, Beč2004N.Topola- SrbacDisassembly of safety rope & installation of OPGW on TL 110 kV Nova Topola – Srbac
SIEMENS, Beč2004Srbac-DerventaDisassembly of safety rope & installation of OPGW on TL 110 kV Srbac – Derventa
SIEMENS, Beč2004PrijedorDisassembly of safety rope & installation of OPGW on TL 110 kV Prijedor 2 – Sanski Most
SIEMENS, Beč2004Ugljevik-ZvornikDisassembly of safety rope & installation of OPGW on TL 110 kV Ugljevik – Zvornik
SIEMENS, Beč2004Banja Luka-LaktašiDisassembly of safety rope & installation of OPGW on TL 110 kV Banja Luka 1 – Laktaši
SIEMENS, Beč2004BijeljinaDisassembly of safety rope & installation of OPGW on TL 110 kV Bijeljina 1 – Bijeljina 2
SIEMENS, Beč2004Gacko-BilećaDisassembly of safety rope & installation of OPGW on TL 110 kV Gacko – Bileća
SIEMENS, Beč2004NevesinjeDisassembly of safety rope & installation of OPGW on TL 110 kV Nevesinje – KT Nevesinje
SIEMENS, Beč2004Bijeljina-BrčkoDisassembly of safety rope & installation of OPGW on TL 110 kV Brčko 2 – Bijeljina 1
SIEMENS, Beč2004Bijeljina-BrčkoDisassembly of safety rope & installation of OPGW on TL 110 kV Višegrad – Goražde 2
SIEMENS, Beč2004Prnjavor-UkrinaDisassembly of safety rope & installation of OPGW on TL 110 kV Prnjavor – Ukrina
SIEMENS, Beč2004Stanari-UkrinaDisassembly of safety rope & installation of OPGW on TL 110 kV Stanari – Ukrina
SIEMENS, Beč2004Stanari-TeslićDisassembly of safety rope & installation of OPGW on TL 110 kV Stanari – Teslić
SIEMENS, Beč2004Doboj-TeslićDisassembly of safety rope & installation of OPGW on TL 110 kV Doboj 1 – Teslić
SIEMENS, Beč2004Brčko-ModričaDisassembly of safety rope & installation of OPGW on TL 110 kV Brčko 2 – Modriča
SIEMENS, Beč2004DobojDisassembly of safety rope & installation of OPGW on TL 110 kV Doboj 1 – Doboj 2
SIEMENS, Beč2004Doboj-DerventaDisassembly of safety rope & installation of OPGW on TL 110 kV Doboj 2 – Derventa
ELEKTRO DOBOJ2003DobojDisassembly of safety rope & installation of OPGW on TL 110 kV Rudanka – Usora
ELEKTROPRENOS, Banja Luka2003Banja LukaDisassembly of safety rope & installation of OPGW on TL 110 kV Prijedor 2 – Prijedor 5
ELEKTROPRENOS, Banja Luka2002Banja Luka - Mrkonjić GradDisassembly of safety rope & installation of OPGW on TL 110 kV Banja Luka – Mrkonjić Grad
ELEKTROPRENOS, Banja Luka2002Banja Luka-GradiškaDisassembly of safety rope & installation of OPGW on TL 110 kV Banja Luka – Gradiška – Topola
ELEKTROPRENOS, Banja Luka2002VlasenicaDisassembly of safety rope & installation of OPGW on TL 110 kV Srebrenica – Konjević Polje – Vlasenica