| Investor | Year | Site | Activities |
| Telekom Srpske, Banja Luka | 2009 | Banja Luka | Supply and installation of distribution cabinets for the second floor in TKC Obilićevo |
| Telekom Srpske, Banja Luka | 2009 | Banja Luka | Execution of construction and electrical works on the adaptation of premises for the placement of equipment in TKC Banja Luka, KC Bijeljina, TKC Pale and TKC Doboj - Lot 1 |
| Faculty of philosophy, Banja Luka | 2009 | Banja Luka | Rehabilitation of electrical installation in dormitory area |
| NLB razvojna banka, Banja Luka | 2008 | Banja Luka | Execution of works on relocate of measuring place from cabinets |
| Volksbank AD, Banja Luka | 2008 | Banja Luka | Suplly and installation of LV system and electrical installation for offices in bank in Istočno Sarajevo |
|
| Volksbank AD, Banja Luka | 2008 | Banja Luka | Suplly and installation of LV power system and electrical power installation for banks offices in Doboj |
| Hemofarm, Banja Luka | 2008 | Banja Luka | HV and LV electrical installation works |
| Vranica BL, Banja Luka | 2008 | Banja Luka | Electrical installation works on administration building GP Vranica BL |
| Vranica BL, Banja Luka | 2008 | Banja Luka | LV and HV electrical installation works in annex ATC Obilićevo Banja Luka |
| Sima d.o.o., Laktaši | 2008 | Laktaši | Suplly and build on electrical material and equipment in the warehouse of purchaser |
| Pevec d.o.o., Banja Luka | 2008 | Banja Luka | Suplly, mounting, execution, inspection and putting HV power electrical installation into operation |
| Pevec d.o.o., Banja Luka | 2008 | Banja Luka | Designing, suplly, mounting, execution, inspection and putting LV power system into operation |
| Pevec d.o.o.,Banja Luka | 2008 | Banja Luka | Suplly, mounting, execution, inspection and putting fire detection into operation |
| Telekom Srpske, Banja Luka | 2008 | Banja Luka | Suplly of material and installation of air conditioning power system |
| Montmontaža | 2008 | Čelarevo | Execution of electric works in brewery Carlsberg – Čelarevo in Serbia |
| Zepter banka, Banja Luka | 2007 | Banja Luka | Supply and installation of low voltage system and electro energetic installations into Zepterbanka premises in Srbac |
| Integral inženjering, Laktaši | 2007 | Banja Luka | Partial execution of electric installation works on RS Government building RS Ministries building |
| Minster church, Sarajevo | 2007 | Sarajevo | Execution of works and material supply on lighting of Minster church - Sarajevo |
| Sima Trade, Laktaši | 2007 | Banja Luka | Material and equipment supply, work on electro energetic installations in factory of croissants Sima Trade – Aleksandrovac |
| Cabinet of RS President | 2007 | Banja Luka | Lighting installation in business object of RS President with material supply |
| Frukta trejd, Brod | 2006 | Brod | Preparation of technical documentation and execution of electrical fitting works on hypermarket |
| Elnos BL, Banja Luka | 2006 | Banja Luka | Preparation of technical documentation and adaptation of new premises of ELNOS BL |
| Zepter banka, Banja Luka | 2006 | Banja Luka | Supply and installation of low voltage system and electro energetic installations into Zepterbanka premises in Bosanski Brod |
| Elnos BL, Banja Luka | 2003 | Banja Luka | Preparation of project documentation and construction of two residential and office buildings |
| TURNER FM | 2003 | Ramići | Assembly of grid switching system/generator 6x250 kVA |