Engineering Team for Measurement, Testing, Protection and Controlling during 2006. is formed as an independent profitable center within the company ELNOS BL. In the years behind us, the team was an integral part of Switching Facilities Team. In the early stage of its existence, the team was based on testing and measurement of electromagnetic and arrester installations in flattering, business and industrial objects, electrical power plants and power lines, and issuance of all necessary certificates. During the last year, the Team for Measurement, Testing, Protection and Controlling is enhanced with a large number of professional staff, who have rich working experience in such operations. In addition to professional staff, who represent the most important link in the Team, in the previous period Team is equipped with a large number of specialized devices and equipment for setting up and testing of relay protection, splicing and testing of optical fiber, etc.
Today, this represents the link in the system operations of all engineering teams within the company and gives them a new note in the business.
Reference List: Engineering Team for Measurement, Testing, Protection and Controlling
Investor | Year | Location | Activities |
| RAFINERIJA ULJA, Modriča | 2010 | Modriča | Revision of power plants and equipment and the elimination of observed defects |
| RAFINERIJA NAFTE, Brod | 2010 | Brod | Supply and installation of cable clamps for XHO-13 3x240 mm2 |
| RAFINERIJA NAFTE, Brod | 2009 | Brod | Designing, supply and build on equipment on EE facilities in the aim of reactive power compensation |
| RAFINERIJA NAFTE, Brod | 2009 | Brod | Works on revizion and repair on the part of LV electrical plant |
| ELEKTROPRIVREDA RS, Trebinje | 2009 | Bočac | Reconstruction of UPS, exitation and turbine regulation in HPP Bočac |
| ZARUBEŽNJEFTE-STROIMONTAŽ | 2009 | Brod | Testing and revision of sections 36, 38 and 39 in Rafnerija nafte |
| HE NA TREBIŠNJICI | 2009 | Trebinje | Testing of electrical protections on HPP Trebinje 2 |
| INSTITUT DR SIMO MILOŠEVIĆ | 2008 | Igalo | Delivery and installation of equipment for PFC |
| RAFINERIJA NAFTE, Brod | 2008 | Brod | Revision, testing, measuring and commissioning of protections on electric power facilities |
| SHP CELEX, Banja Luka | 2008 | Banja Luka | Supply of equipment and reconstruction of transformer plant |
| ELEKTROKRAJINA, Banja Luka | 2007 | Banja Luka | Supply and installation of MTK frequence command for SS 110/20/10 kV Banja Luka III |
| RITE UGLJEVIK | 2007 | Ugljevik | Reconstruction of generator field direction 400 kV |